1 |
Reductions in
Setup Time Using Dedicated Fixtures on Stevens Modular
Components |
2 |
Elimination of Tooling Expense
Using Setup Components on Stevens Primary Table Tooling |
|
PAYOUT= |
PAYOUT=
|
|
INVESTMENT
IN MODULAR FIXTURING
SAVINGS
IN SETUP COST |
INVESTMENT
IN MODULAR FIXTURING
NET
SAVING IN FIXTURING EXPENSE
|
|
|
|
|
Setups like the one shown on the
left side of the opposite page can be done in .1 hours or less
using Stevens Modular Fixturing. The same setup using
conventional techniques on a T-slotted table or pallet would
require 3.8 hours. |
In determining net savings in
fixturing expense, you will need to make certain estimates based
on your own experience. For example, the setup shown on the
opposite page would require a fixture costing about $1,800.
However, the net savings in fixturing expense will be $1,800
minus the cost of setting up with modular setup components. The
setup shown on the right side of the opposite page would require
about 3.6 hours to design and build initially.
|
|
Payout= |
(Repeat setups would require about
.3 hours)
|
|
Total
Investment = $3,776.00
Savings
(3.8 - .1) x $45.00/hr
=22.67
setups |
Net
savings in fixturing expense
=$1,800
- (3.6 hrs. x $45.00)
=$1,674.00
|
|
This means that if
average savings per setup approximate $167.00, the investment in
Stevens Modular Fixturing would be paid for after about 23
setups. If you change setups once a week, the investment will be
paid for in less than 6 months.
Note: Stevens will
jig bore and bush your dedicated fixtures to fit Stevens Primary
Table Tooling, on a contract basis.
|
The actual cost of the modular
components used in this setup is $5,234. An assortment of
modular fixturing with setup components offering reasonable
flexibility in setting up parts in this size range would
approximate $13,800. Accordingly, we calculate the payout as
follows:
|
|
Payout=
|
|
INVESTMENT
IN MODULAR FIXTURING
NET
SAVINGS IN FIXTURING EXPENSE
=
$13,800
$1,674
=
8.24 fixtures
|
|
This means that for setups of this
type a Stevens Modular Fixturing package will pay for itself by
eliminating the need for building slightly more than 8 dedicated
fixtures.
Payout time will depend on how
many fixtures are normally made in a specific time span.
|